1 post tagged “photostitching”
There were two of us and a forklift collecting in the Ped' barrier at 17kg a piece and 50 panels in a pack means a pack weighs 850kg, not a problem for the forklift, but we had to lift and place every panel in a pack. I should've made a note of how many packs we loaded. I moved several tonnes of Steel during the day.
It was a good day though. After the stress of the build, having to think and solves problems. It was great to just relax and stack barrier. To actually see the result of your labours, as the field emptied of barrier and the truck filled up.
Mind you, I do ache a bit today.